Betton-Cline-Chamberlin - Stormwater Improvements Project |

|
Complex Hydrodynamic Modeling
- 3 Square Mile Watershed
- Regulatory Permitting
- FEMA Flood Plain Amendment
|
Project Design:
-
SAI designed and prepared construction plans for a number of drainage retrofit features including pond excavations, gabion construction, roadway reconstruction, box culvert and outfall structure design, sanitary sewer relocation, and littoral zones, and an in-line floatable debris skimmer and trash trap.
-
Public involvement was incorporated into the design process.
Another design feature bifurcated the main channel to improve water quality in the previously stagnant Laguna Pond.
-
SAI was also responsible for permitting of the project through FDEP as well as submittal of flood plain revisions to FEMA.

Stormwater Modeling / Investigation:
-
Modeling of the 3 square mile watershed was conducted using the FEMA approved ICPR model.
-
A comprehensive inventory and evaluation of the existing drainage system was conducted.
-
Flooding areas were identified and/or confirmed through a detailed comparison of modeled flood stages with known roadway and structure elevations.
-
It was determined that flooding was due in large part to lost storage capacity from siltation in existing ponds.
-
A master drainage plan was prepared to summarize the existing conditions analyses and present a plan to rectify the deficiencies.
|
|
|
|
| |
|
| |
|