Project Background and Purpose:

Under contract with the Orange County Department of Public Works, SAI prepared a comprehensive stormwater master plan.
-
The objectives of the project included the following:
-
Update the original master plan based on new information and evaluate the effectiveness of the previously implemented capital improvements (SAI prepared the original master plan 15 years earlier), and
-
Provide the County with a tool for planning future capital improvements with respect to flood protection.
Project Design / Implementation:
Stormwater Modeling / Investigation:
-
The project area is characterized by a high groundwater table with very little topographic relief and frequented with shallow depressions.
-
An extensive inventory of the drainage infrastructure was conducted. A user-friendly graphically oriented database was developed for the management of this information.
-
Comprehensive stormwater modeling of the 7.1 square mile watershed was conducted using the FEMA approved ICPR model.
-
An existing conditions model was developed through extensive site reconnaissance as well as the review of numerous reports, previous studies, permits, construction plan sets, aerials, and topographic maps.
-
In order to address historically reported flooding concerns, the model was refined to include some secondary drainage systems.
|
|
|
|
| |
|
| |
|